The duration of a project depends on various factors, including whether an estimate has already been provided, the complexity of the work, and the need for permits or drawings. If an estimate has already been given, the work can often be completed the same day, depending on the project's complexity.
If permits or drawings are required, the timeline will be outlined in the contract along with the estimate or proposal provided to the client. We always strive to be efficient and fast while maintaining the highest quality standards.
Here are some estimated timeframes for common residential repair and construction projects:
-
Installing a fence around a 200-linear-foot house: 1 day.
-
Remodeling a standard-size bathroom (8x5 feet): At least 1 week.
-
Painting a house exterior: 2 days.
-
Painting a house interior: 4 days, depending on the size and wall condition.
-
Replacing an exterior door: 4 to 6 hours.
-
Installing a window: Approximately 1.5 hours, but can vary based on size, type, and complexity.
-
Installing a new roof: 1 to 2 days, depending on complexity.
-
Replacing a sink: Around 2 hours.
-
Installing a kitchen faucet: About 1 hour.
Each project may have different requirements and factors that influence its duration. Our goal is always to complete projects efficiently while maintaining excellent quality and craftsmanship.